CORC  > 西安交通大学
Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station
Liu, Jing; Luo, Xianjue
刊名Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering
2012
卷号32期号:[db:dc_citation_issue]页码:27-35
关键词Environmental economics Heuristic strategy Hydrothermal power systems Power generation scheduling Price penalty factor
ISSN号0258-8013
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4455522
专题西安交通大学
推荐引用方式
GB/T 7714
Liu, Jing,Luo, Xianjue. Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station[J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,2012,32([db:dc_citation_issue]):27-35.
APA Liu, Jing,&Luo, Xianjue.(2012).Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station.Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,32([db:dc_citation_issue]),27-35.
MLA Liu, Jing,et al."Short-term optimal environmental economic hydrothermal scheduling based on handling complicated constraints of multi-chain cascaded hydropower station".Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering 32.[db:dc_citation_issue](2012):27-35.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace