DE solution for the earliness/tardiness case of Hybrid Flow-shop Scheduling problem with priority strategy
Han ZH(韩忠华); Shi HB(史海波); Qiao F(乔枫); Yue L(岳磊)
2011
会议名称2011 International Conference on Modelling, Identification and Control
会议日期June 26-29, 2011
会议地点Shanghai, China
页码12-17
中文摘要The earliness/tardiness (E/T) case of Hybrid Flow-shop Scheduling problem (HFSP) is an NP hard problem, which is difficult to deal with, however, the local assignment existing in the practical production increases the complexity of this problem. How to solve the combinatorial optimization problem effectively and optimally is still an open issue today. In this paper, differential evolution algorithm (DE) combined with priority strategy is used to solve this E/T scheduling problem. Firstly, DE algorithm is used to make global assignment and obtain each job's process route. Secondly, the operating priority of the jobs in buffer area deduced from the expectation completion sequence is used to direct the local production assignment between stages, then the starting time of each job can be determined. Finally, under the constraints of the due-date, the global optimization with the minimal penalty sum of E/T is obtained. Several scheme comparisons with simulation results show the effectiveness of the proposed method.
收录类别EI
产权排序1
会议录2011 International Conference on Modelling, Identification and Control
会议录出版者IEEE
会议录出版地Piscataway, NJ, USA
语种英语
ISBN号978-0-9567157-0-8
内容类型会议论文
源URL[http://ir.sia.cn/handle/173321/7688]  
专题沈阳自动化研究所_自动化系统研究室
推荐引用方式
GB/T 7714
Han ZH,Shi HB,Qiao F,et al. DE solution for the earliness/tardiness case of Hybrid Flow-shop Scheduling problem with priority strategy[C]. 见:2011 International Conference on Modelling, Identification and Control. Shanghai, China. June 26-29, 2011.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace