CORC  > 西安交通大学
MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS
Wang, Ji-Bo; Wang, Ming-Zheng
刊名ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH
2013
卷号30期号:[db:dc_citation_issue]
关键词Scheduling branch-and-bound algorithm flow shop makespan deteriorating jobs
ISSN号0217-5959
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4446171
专题西安交通大学
推荐引用方式
GB/T 7714
Wang, Ji-Bo,Wang, Ming-Zheng. MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS[J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH,2013,30([db:dc_citation_issue]).
APA Wang, Ji-Bo,&Wang, Ming-Zheng.(2013).MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS.ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH,30([db:dc_citation_issue]).
MLA Wang, Ji-Bo,et al."MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS".ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH 30.[db:dc_citation_issue](2013).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace