CORC  > 大连理工大学
Dual-test middle shaft loading and unloading method, involves fixing high-pressure terminal with angle iron fixing device, connecting radial guide block with high-pressure terminal, and connecting foundation bed with medium shaft.
LIU C WANG F WANG B WANG M ZHANG T
2016
公开日期2016-07-20
URL标识查看原文
申请日期2016-03-23
内容类型专利
URI标识http://www.corc.org.cn/handle/1471x/4381471
专题大连理工大学
作者单位UNIV DALIAN TECHNOLOGY (UYDA-C
推荐引用方式
GB/T 7714
LIU C WANG F WANG B WANG M ZHANG T. Dual-test middle shaft loading and unloading method, involves fixing high-pressure terminal with angle iron fixing device, connecting radial guide block with high-pressure terminal, and connecting foundation bed with medium shaft.. 2016-01-01.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace