Dynamic Economic Dispatch of Power System Considering Temporal Correlation of Wind Power Sequence | |
Liu, Ji; Xu, Jian; Sun, Yuanzhang; Zhou, Guohai; Wang, Jing; Wei, Congying | |
刊名 | Dianli Xitong Zidonghua/Automation of Electric Power Systems |
2019 | |
卷号 | 43期号:3 |
ISSN号 | 1000-1026 |
DOI | 10.7500/AEPS20180321003 |
URL标识 | 查看原文 |
收录类别 | EI |
语种 | 中文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4232237 |
专题 | 武汉大学 |
推荐引用方式 GB/T 7714 | Liu, Ji,Xu, Jian,Sun, Yuanzhang,et al. Dynamic Economic Dispatch of Power System Considering Temporal Correlation of Wind Power Sequence[J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems,2019,43(3). |
APA | Liu, Ji,Xu, Jian,Sun, Yuanzhang,Zhou, Guohai,Wang, Jing,&Wei, Congying.(2019).Dynamic Economic Dispatch of Power System Considering Temporal Correlation of Wind Power Sequence.Dianli Xitong Zidonghua/Automation of Electric Power Systems,43(3). |
MLA | Liu, Ji,et al."Dynamic Economic Dispatch of Power System Considering Temporal Correlation of Wind Power Sequence".Dianli Xitong Zidonghua/Automation of Electric Power Systems 43.3(2019). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论