CORC  > 武汉大学
An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem
Hu, Wenbin; Wang, Huan; Peng, Chao; Wang, Huang; Liang, Huangle; Du, Bo
刊名SOFT COMPUTING
2015
卷号19期号:8
关键词Cellular automata Fuzzy cell Uncertainty Multi-project scheduling Outer-inner
ISSN号1432-7643
DOI10.1007/s00500-014-1395-5
URL标识查看原文
收录类别SCIE ; EI
语种英语
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4114752
专题武汉大学
推荐引用方式
GB/T 7714
Hu, Wenbin,Wang, Huan,Peng, Chao,et al. An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem[J]. SOFT COMPUTING,2015,19(8).
APA Hu, Wenbin,Wang, Huan,Peng, Chao,Wang, Huang,Liang, Huangle,&Du, Bo.(2015).An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem.SOFT COMPUTING,19(8).
MLA Hu, Wenbin,et al."An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem".SOFT COMPUTING 19.8(2015).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace