Using a Bayesian Probabilistic Forecasting Model to Analyze the Uncertainty in Real-Time Dynamic Control of the Flood Limiting Water Level for Reservoir Operation | |
Liu, Dedi; Li, Xiang; Guo, Shenglian; Rosbjerg, Dan; Chen, Hua | |
刊名 | JOURNAL OF HYDROLOGIC ENGINEERING |
2015 | |
卷号 | 20期号:2 |
关键词 | Bayesian forecasting system Flood limiting water level Dynamic control Reservoir operation Three Gorges Reservoir |
ISSN号 | 1084-0699 |
DOI | 10.1061/(ASCE)HE.1943-5584.0000979 |
URL标识 | 查看原文 |
收录类别 | SCIE ; EI |
语种 | 英语 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4111589 |
专题 | 武汉大学 |
推荐引用方式 GB/T 7714 | Liu, Dedi,Li, Xiang,Guo, Shenglian,et al. Using a Bayesian Probabilistic Forecasting Model to Analyze the Uncertainty in Real-Time Dynamic Control of the Flood Limiting Water Level for Reservoir Operation[J]. JOURNAL OF HYDROLOGIC ENGINEERING,2015,20(2). |
APA | Liu, Dedi,Li, Xiang,Guo, Shenglian,Rosbjerg, Dan,&Chen, Hua.(2015).Using a Bayesian Probabilistic Forecasting Model to Analyze the Uncertainty in Real-Time Dynamic Control of the Flood Limiting Water Level for Reservoir Operation.JOURNAL OF HYDROLOGIC ENGINEERING,20(2). |
MLA | Liu, Dedi,et al."Using a Bayesian Probabilistic Forecasting Model to Analyze the Uncertainty in Real-Time Dynamic Control of the Flood Limiting Water Level for Reservoir Operation".JOURNAL OF HYDROLOGIC ENGINEERING 20.2(2015). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论