CORC  > 武汉大学
Efficient 3-D reliability analysis of the 530 m high abutment slope at Jinping I Hydropower Station during construction
Li, Dian-Qing; Jiang, Shui-Hua; Cao, Zi-Jun; Zhou, Chuang-Bing; Li, Xue-You; Zhang, Li-Min
刊名ENGINEERING GEOLOGY
2015
卷号195
关键词Jinping I Hydropower Station Rock slope Reliability analysis Slope stabilization Shear strength reduction Response surface
ISSN号0013-7952
DOI10.1016/j.enggeo.2015.06.007
URL标识查看原文
收录类别SCIE ; EI
语种英语
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4108834
专题武汉大学
推荐引用方式
GB/T 7714
Li, Dian-Qing,Jiang, Shui-Hua,Cao, Zi-Jun,et al. Efficient 3-D reliability analysis of the 530 m high abutment slope at Jinping I Hydropower Station during construction[J]. ENGINEERING GEOLOGY,2015,195.
APA Li, Dian-Qing,Jiang, Shui-Hua,Cao, Zi-Jun,Zhou, Chuang-Bing,Li, Xue-You,&Zhang, Li-Min.(2015).Efficient 3-D reliability analysis of the 530 m high abutment slope at Jinping I Hydropower Station during construction.ENGINEERING GEOLOGY,195.
MLA Li, Dian-Qing,et al."Efficient 3-D reliability analysis of the 530 m high abutment slope at Jinping I Hydropower Station during construction".ENGINEERING GEOLOGY 195(2015).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace