CORC  > 武汉理工大学
An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost
Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin*; Huang, Yuehua; Ikram, Rana M.
刊名Energy Conversion and Management
2015
卷号96页码:568-578
关键词Hydro-thermal-wind scheduling Wind power cost Multi-objective optimization NSGA-III Constraint handling
ISSN号0196-8904
DOI10.1016/j.enconman.2015.03.009
URL标识查看原文
WOS记录号WOS:000353729200052;EI:20151300679054
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3367271
专题武汉理工大学
作者单位1.[Yuan, Xiaohui
2.Ikram, Rana M.
3.Tian, Hao] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China.
推荐引用方式
GB/T 7714
Yuan, Xiaohui,Tian, Hao,Yuan, Yanbin*,et al. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost[J]. Energy Conversion and Management,2015,96:568-578.
APA Yuan, Xiaohui,Tian, Hao,Yuan, Yanbin*,Huang, Yuehua,&Ikram, Rana M..(2015).An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost.Energy Conversion and Management,96,568-578.
MLA Yuan, Xiaohui,et al."An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost".Energy Conversion and Management 96(2015):568-578.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace