CORC  > 大连理工大学
A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry
Yu, B.; Wu, E.; Chen, C.; Yang, Y.; Yao, B. Z.; Lin, Q.
刊名ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT
2017
卷号12页码:305-320
关键词Automotive industry Automotive parts Disassembly sequence Disassembly model Disassembly network Floyd-Warshall algorithm
ISSN号1854-6250
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3308372
专题大连理工大学
作者单位1.Beihang Univ, Sch Transportat Sci & Engn, Beijing, Peoples R China.
2.Dalian Univ Technol, Automot Engn Coll, Dalian, Peoples R China.
3.Dalian Maritime Univ, Transportat Management Coll, Dalian, Peoples R China.
推荐引用方式
GB/T 7714
Yu, B.,Wu, E.,Chen, C.,et al. A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry[J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT,2017,12:305-320.
APA Yu, B.,Wu, E.,Chen, C.,Yang, Y.,Yao, B. Z.,&Lin, Q..(2017).A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry.ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT,12,305-320.
MLA Yu, B.,et al."A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry".ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT 12(2017):305-320.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace