A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry | |
Yu, B.; Wu, E.; Chen, C.; Yang, Y.; Yao, B. Z.; Lin, Q. | |
刊名 | ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT
![]() |
2017 | |
卷号 | 12页码:305-320 |
关键词 | Automotive industry Automotive parts Disassembly sequence Disassembly model Disassembly network Floyd-Warshall algorithm |
ISSN号 | 1854-6250 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3308372 |
专题 | 大连理工大学 |
作者单位 | 1.Beihang Univ, Sch Transportat Sci & Engn, Beijing, Peoples R China. 2.Dalian Univ Technol, Automot Engn Coll, Dalian, Peoples R China. 3.Dalian Maritime Univ, Transportat Management Coll, Dalian, Peoples R China. |
推荐引用方式 GB/T 7714 | Yu, B.,Wu, E.,Chen, C.,et al. A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry[J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT,2017,12:305-320. |
APA | Yu, B.,Wu, E.,Chen, C.,Yang, Y.,Yao, B. Z.,&Lin, Q..(2017).A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry.ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT,12,305-320. |
MLA | Yu, B.,et al."A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry".ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT 12(2017):305-320. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论