Simulation of Very Fast Transient Overvoltage Caused by Disconnector Switch Operation in SF6 Gas Insulated Switchgear using Multi-Restrike Arcing Model | |
Xin, Weifeng; Zhang, Guogang; Wang, Jianqiang; Liu, Kai; Geng, Yingsan | |
2013 | |
期号 | [db:dc_citation_issue] |
DOI | [db:dc_identifier_doi] |
会议录 | 2013 2ND INTERNATIONAL CONFERENCE ON ELECTRIC POWER EQUIPMENT - SWITCHING TECHNOLOGY (ICEPE-ST)
![]() |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3305476 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Xin, Weifeng,Zhang, Guogang,Wang, Jianqiang,et al. Simulation of Very Fast Transient Overvoltage Caused by Disconnector Switch Operation in SF6 Gas Insulated Switchgear using Multi-Restrike Arcing Model[C]. 见:. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论