CORC  > 西安交通大学
A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
Yan, Hong-Sen; Wan, Xiao-Qin; Xiong, Fu-Li
刊名INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
2014
卷号52期号:[db:dc_citation_issue]页码:5626-5639
关键词two-stage assembly flow shop scheduling hybrid VNS-EM algorithm dominance relation earliness and lateness
ISSN号0020-7543
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3299918
专题西安交通大学
推荐引用方式
GB/T 7714
Yan, Hong-Sen,Wan, Xiao-Qin,Xiong, Fu-Li. A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2014,52([db:dc_citation_issue]):5626-5639.
APA Yan, Hong-Sen,Wan, Xiao-Qin,&Xiong, Fu-Li.(2014).A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,52([db:dc_citation_issue]),5626-5639.
MLA Yan, Hong-Sen,et al."A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem".INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 52.[db:dc_citation_issue](2014):5626-5639.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace