CORC  > 大连理工大学
Peak operation of hydropower system with parallel technique and progressive optimality algorithm
Feng, Zhong-kai; Niu, Wen-jing; Cheng, Chun-tian; Wu, Xin-yu
刊名INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS
2018
卷号94页码:267-275
关键词Hydropower reservoirs Peak operation Progressive optimality algorithm Fork/Join framework Parallel computing Curse of dimensionality
ISSN号0142-0615
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3277094
专题大连理工大学
作者单位1.Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China.
2.Changfiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Hubei, Peoples R China.
3.Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China.
推荐引用方式
GB/T 7714
Feng, Zhong-kai,Niu, Wen-jing,Cheng, Chun-tian,et al. Peak operation of hydropower system with parallel technique and progressive optimality algorithm[J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2018,94:267-275.
APA Feng, Zhong-kai,Niu, Wen-jing,Cheng, Chun-tian,&Wu, Xin-yu.(2018).Peak operation of hydropower system with parallel technique and progressive optimality algorithm.INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,94,267-275.
MLA Feng, Zhong-kai,et al."Peak operation of hydropower system with parallel technique and progressive optimality algorithm".INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS 94(2018):267-275.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace