CORC  > 大连理工大学
Optimizing electrical power production of hydropower system by uniform progressive optimality algorithm based on two-stage search mechanism and uniform design
Feng, Zhong-kai; Niu, Wen-jing; Cheng, Chun-tian
刊名JOURNAL OF CLEANER PRODUCTION
2018
卷号190页码:432-442
关键词Hydropower system operation Progressive optimality algorithm Dimensionality reduction Curse of dimensionality Uniform design Successive approximation
ISSN号0959-6526
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3264763
专题大连理工大学
作者单位1.Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China.
2.ChangJiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Hubei, Peoples R China.
3.Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China.
推荐引用方式
GB/T 7714
Feng, Zhong-kai,Niu, Wen-jing,Cheng, Chun-tian. Optimizing electrical power production of hydropower system by uniform progressive optimality algorithm based on two-stage search mechanism and uniform design[J]. JOURNAL OF CLEANER PRODUCTION,2018,190:432-442.
APA Feng, Zhong-kai,Niu, Wen-jing,&Cheng, Chun-tian.(2018).Optimizing electrical power production of hydropower system by uniform progressive optimality algorithm based on two-stage search mechanism and uniform design.JOURNAL OF CLEANER PRODUCTION,190,432-442.
MLA Feng, Zhong-kai,et al."Optimizing electrical power production of hydropower system by uniform progressive optimality algorithm based on two-stage search mechanism and uniform design".JOURNAL OF CLEANER PRODUCTION 190(2018):432-442.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace