CORC  > 大连理工大学
Modeling and Solution Techniques Used for Hydro Generation Scheduling
Parvez, Iram; Shen, Jianjian; Khan, Mehran; Cheng, Chuntian
刊名WATER
2019
卷号11
关键词hydropower scheduling techniques constraints programming and solving
ISSN号2073-4441
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3231221
专题大连理工大学
作者单位1.Dalian Univ Technol, Inst Hydropower & Hydro Informat, Dalian 116024, Peoples R China.
2.Dalian Univ Technol, Inst Hydropower & Hydro Informat, Dalian 116024, Peoples R China.
3.Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China.
4.Dalian Univ Technol, Sch Civil Engn, Dalian 116024, Peoples R China.
推荐引用方式
GB/T 7714
Parvez, Iram,Shen, Jianjian,Khan, Mehran,et al. Modeling and Solution Techniques Used for Hydro Generation Scheduling[J]. WATER,2019,11.
APA Parvez, Iram,Shen, Jianjian,Khan, Mehran,&Cheng, Chuntian.(2019).Modeling and Solution Techniques Used for Hydro Generation Scheduling.WATER,11.
MLA Parvez, Iram,et al."Modeling and Solution Techniques Used for Hydro Generation Scheduling".WATER 11(2019).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace