A Multi-Objective Risk Scheduling Model of an Electrical Power System-Containing Wind Power Station with Wind and Energy Storage Integration | |
He, Hai; Peng, Feixiang; Gao, Zhengnan; Liu, Xin; Hu, Shubo; Zhou, Wei; Sun, Hui | |
刊名 | ENERGIES
![]() |
2019 | |
卷号 | 12 |
关键词 | wind power risk optimal operation battery energy storage |
ISSN号 | 1996-1073 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3215634 |
专题 | 大连理工大学 |
作者单位 | 1.Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China. 2.State Grid Anshan Elect Power Supply Co, Anshan 114000, Peoples R China. 3.Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China. 4.State Grid Shenyang Elect Power Supply Co, Shenyang 116001, Liaoning, Peoples R China. |
推荐引用方式 GB/T 7714 | He, Hai,Peng, Feixiang,Gao, Zhengnan,et al. A Multi-Objective Risk Scheduling Model of an Electrical Power System-Containing Wind Power Station with Wind and Energy Storage Integration[J]. ENERGIES,2019,12. |
APA | He, Hai.,Peng, Feixiang.,Gao, Zhengnan.,Liu, Xin.,Hu, Shubo.,...&Sun, Hui.(2019).A Multi-Objective Risk Scheduling Model of an Electrical Power System-Containing Wind Power Station with Wind and Energy Storage Integration.ENERGIES,12. |
MLA | He, Hai,et al."A Multi-Objective Risk Scheduling Model of an Electrical Power System-Containing Wind Power Station with Wind and Energy Storage Integration".ENERGIES 12(2019). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论