Study on the calculation model of maximum allowable time and ampacity for overload operation of overhead transmission line in a short time | |
Xia, Ziqing[1]; Xia, Yunfeng[2]; Xu, Zheng[3]; Wu, Jiamin[3] | |
会议日期 | November 26, 2015 - November 29, 2015 |
会议地点 | Changsha, China |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3203271 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Xia, Ziqing[1],Xia, Yunfeng[2],Xu, Zheng[3],et al. Study on the calculation model of maximum allowable time and ampacity for overload operation of overhead transmission line in a short time[C]. 见:. Changsha, China. November 26, 2015 - November 29, 2015. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论