CORC  > 重庆大学
江北城CBD区域江水源热泵集中供冷供热项目2号能源站蓄冷率的确定 Cool Storage Rate Determination of No.2 Energy Station of Concentrated Cooling and Heating Project with River Water Source Heat Pump in CDB of Jiangbei District
王晶[1]; 王本栋[2]; 张华玲[2]
2014
卷号13页码:13-15
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3200714
专题重庆大学
推荐引用方式
GB/T 7714
王晶[1],王本栋[2],张华玲[2]. 江北城CBD区域江水源热泵集中供冷供热项目2号能源站蓄冷率的确定 Cool Storage Rate Determination of No.2 Energy Station of Concentrated Cooling and Heating Project with River Water Source Heat Pump in CDB of Jiangbei District[J],2014,13:13-15.
APA 王晶[1],王本栋[2],&张华玲[2].(2014).江北城CBD区域江水源热泵集中供冷供热项目2号能源站蓄冷率的确定 Cool Storage Rate Determination of No.2 Energy Station of Concentrated Cooling and Heating Project with River Water Source Heat Pump in CDB of Jiangbei District.,13,13-15.
MLA 王晶[1],et al."江北城CBD区域江水源热泵集中供冷供热项目2号能源站蓄冷率的确定 Cool Storage Rate Determination of No.2 Energy Station of Concentrated Cooling and Heating Project with River Water Source Heat Pump in CDB of Jiangbei District".13(2014):13-15.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace