CORC  > 重庆大学
Performance of a Prestressed Concrete Pipe Energy Pile during Heating and Cooling
Chen, Yonghui[1]; Xu, Jie[1]; Li, Hang[2,3]; Chen, Long[3]; Ng, Charles W. W.[4]; Liu, Hanlong[5]
2017
卷号31
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3195269
专题重庆大学
推荐引用方式
GB/T 7714
Chen, Yonghui[1],Xu, Jie[1],Li, Hang[2,3],et al. Performance of a Prestressed Concrete Pipe Energy Pile during Heating and Cooling[J],2017,31.
APA Chen, Yonghui[1],Xu, Jie[1],Li, Hang[2,3],Chen, Long[3],Ng, Charles W. W.[4],&Liu, Hanlong[5].(2017).Performance of a Prestressed Concrete Pipe Energy Pile during Heating and Cooling.,31.
MLA Chen, Yonghui[1],et al."Performance of a Prestressed Concrete Pipe Energy Pile during Heating and Cooling".31(2017).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace