浅埋暗挖地铁车站施工方案模糊优选 Fuzzy optimization of construction scheme for metro station with NATM (New Austrian Tunnelling Method) | |
瞿万波[1]; 刘新荣[2]; 黄瑞金[3]; 刘明忠[3] | |
2012 | |
页码 | 54-57 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3187655 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | 瞿万波[1],刘新荣[2],黄瑞金[3],等. 浅埋暗挖地铁车站施工方案模糊优选 Fuzzy optimization of construction scheme for metro station with NATM (New Austrian Tunnelling Method)[J],2012:54-57. |
APA | 瞿万波[1],刘新荣[2],黄瑞金[3],&刘明忠[3].(2012).浅埋暗挖地铁车站施工方案模糊优选 Fuzzy optimization of construction scheme for metro station with NATM (New Austrian Tunnelling Method).,54-57. |
MLA | 瞿万波[1],et al."浅埋暗挖地铁车站施工方案模糊优选 Fuzzy optimization of construction scheme for metro station with NATM (New Austrian Tunnelling Method)".(2012):54-57. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论