Determination of optimum blast furnace slag cooling rate for slag recycling in cement manufacture | |
Qin, Y. L.[1]; Lv, X. W.[2]; Zhang, J.[2]; Hao, J. L.[2]; Bai, C. G.[2] | |
2015 | |
卷号 | 42页码:395-400 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3178415 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Qin, Y. L.[1],Lv, X. W.[2],Zhang, J.[2],et al. Determination of optimum blast furnace slag cooling rate for slag recycling in cement manufacture[J],2015,42:395-400. |
APA | Qin, Y. L.[1],Lv, X. W.[2],Zhang, J.[2],Hao, J. L.[2],&Bai, C. G.[2].(2015).Determination of optimum blast furnace slag cooling rate for slag recycling in cement manufacture.,42,395-400. |
MLA | Qin, Y. L.[1],et al."Determination of optimum blast furnace slag cooling rate for slag recycling in cement manufacture".42(2015):395-400. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论