Roof control of long-wall full-mechanized mining along strike of steep coal seam | |
Cao, Shu-Gang[1]; Liu, Yu-Cheng[1,2]; Peng, Yong[3]; Li, Yong[1]; Liu, Hua-Lin[3] | |
2009 | |
卷号 | 26页码:441-444 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3046901 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Cao, Shu-Gang[1],Liu, Yu-Cheng[1,2],Peng, Yong[3],et al. Roof control of long-wall full-mechanized mining along strike of steep coal seam[J],2009,26:441-444. |
APA | Cao, Shu-Gang[1],Liu, Yu-Cheng[1,2],Peng, Yong[3],Li, Yong[1],&Liu, Hua-Lin[3].(2009).Roof control of long-wall full-mechanized mining along strike of steep coal seam.,26,441-444. |
MLA | Cao, Shu-Gang[1],et al."Roof control of long-wall full-mechanized mining along strike of steep coal seam".26(2009):441-444. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论