Probabilistic evaluation of power system operational risk based on daily generation scheduling | |
Wang, Chengliang[1]; Zhao, Yuan[1]; Zhou, Jiaqi[1]; Liu, Wei[1]; Han, Songbo[2] | |
2008 | |
卷号 | 32页码:6-10 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3042450 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Wang, Chengliang[1],Zhao, Yuan[1],Zhou, Jiaqi[1],et al. Probabilistic evaluation of power system operational risk based on daily generation scheduling[J],2008,32:6-10. |
APA | Wang, Chengliang[1],Zhao, Yuan[1],Zhou, Jiaqi[1],Liu, Wei[1],&Han, Songbo[2].(2008).Probabilistic evaluation of power system operational risk based on daily generation scheduling.,32,6-10. |
MLA | Wang, Chengliang[1],et al."Probabilistic evaluation of power system operational risk based on daily generation scheduling".32(2008):6-10. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论