制造/再制造集成物流网络的优化设计研究 Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty | |
伍星华[1]; 王旭[2]; 林云[1] | |
2010 | |
卷号 | 46页码:201-204 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3009123 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | 伍星华[1],王旭[2],林云[1]. 制造/再制造集成物流网络的优化设计研究 Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty[J],2010,46:201-204. |
APA | 伍星华[1],王旭[2],&林云[1].(2010).制造/再制造集成物流网络的优化设计研究 Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty.,46,201-204. |
MLA | 伍星华[1],et al."制造/再制造集成物流网络的优化设计研究 Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty".46(2010):201-204. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论