An optimization model for casting start time decision of continuous caster in steel plant | |
Gong, Yong-Min[1]; Zheng, Zhong[1]; Long, Jian-Yu[1]; Gao, Xiao-Qiang[2] | |
2016 | |
卷号 | 37页码:203-207 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2980261 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Gong, Yong-Min[1],Zheng, Zhong[1],Long, Jian-Yu[1],et al. An optimization model for casting start time decision of continuous caster in steel plant[J],2016,37:203-207. |
APA | Gong, Yong-Min[1],Zheng, Zhong[1],Long, Jian-Yu[1],&Gao, Xiao-Qiang[2].(2016).An optimization model for casting start time decision of continuous caster in steel plant.,37,203-207. |
MLA | Gong, Yong-Min[1],et al."An optimization model for casting start time decision of continuous caster in steel plant".37(2016):203-207. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论