Production scheduling problems of steelmaking-continuous casting process in dynamic production environment | |
Zheng, Zhong[1]; Long, Jian-yu[1]; Gao, Xiao-qiang[2] | |
2017 | |
卷号 | 24页码:586-594 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2979362 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Zheng, Zhong[1],Long, Jian-yu[1],Gao, Xiao-qiang[2]. Production scheduling problems of steelmaking-continuous casting process in dynamic production environment[J],2017,24:586-594. |
APA | Zheng, Zhong[1],Long, Jian-yu[1],&Gao, Xiao-qiang[2].(2017).Production scheduling problems of steelmaking-continuous casting process in dynamic production environment.,24,586-594. |
MLA | Zheng, Zhong[1],et al."Production scheduling problems of steelmaking-continuous casting process in dynamic production environment".24(2017):586-594. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论