CORC  > 重庆大学
Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
Zheng, Zhong[1]; Long, Jian-yu[1]; Gao, Xiao-qiang[2]
2017
卷号24页码:586-594
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2979362
专题重庆大学
推荐引用方式
GB/T 7714
Zheng, Zhong[1],Long, Jian-yu[1],Gao, Xiao-qiang[2]. Production scheduling problems of steelmaking-continuous casting process in dynamic production environment[J],2017,24:586-594.
APA Zheng, Zhong[1],Long, Jian-yu[1],&Gao, Xiao-qiang[2].(2017).Production scheduling problems of steelmaking-continuous casting process in dynamic production environment.,24,586-594.
MLA Zheng, Zhong[1],et al."Production scheduling problems of steelmaking-continuous casting process in dynamic production environment".24(2017):586-594.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace