A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve | |
Tang, Zhe; Wu, Jiang; Yao, Nana; Gao, Feng | |
刊名 | Dianwang Jishu/Power System Technology |
2016 | |
卷号 | 40页码:2128-2133 |
关键词 | Ancillary service Load curtailment Optimized production scheduling Power System Production Scheduling Purchasing costs Robust production Scheduling strategies |
ISSN号 | 1000-3673 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2963433 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Tang, Zhe,Wu, Jiang,Yao, Nana,et al. A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve[J]. Dianwang Jishu/Power System Technology,2016,40:2128-2133. |
APA | Tang, Zhe,Wu, Jiang,Yao, Nana,&Gao, Feng.(2016).A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve.Dianwang Jishu/Power System Technology,40,2128-2133. |
MLA | Tang, Zhe,et al."A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve".Dianwang Jishu/Power System Technology 40(2016):2128-2133. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论