The progress of the HIRFL-CSR project and the commissioning of the cluster target
Scott, MP; Cai, Xiaohong1; Lu, Rongchun1; Shao, Caojie1; Ruan, Fangfang1; Yu, Deyang1; Li, Mingsheng1; Torpokov, D. K.2; Shestakov, Yu. V.2; Sadykov, R. S.2
2007
卷号58
DOI10.1088/1742-6596/58/1/008
页码55-+
英文摘要HIRFL-CSR, a new cooler-storage-ring project, is the post-acceleration system of the Heavy Ion Research Facility in Lanzhou (HIRFL) consisting of a main ring (CSRm) and an experimental ring (CSRe). The construction of the HIRFL-CSR complex is nearing completion. The stored beam in the CSRm has been observed. Recently, the stored beam was accelerated from 7 MeV/u to 30 MeV/u. The cluster target is located in one straight section of the CSRe providing cluster jet targets of inert gases and small molecular gases. The cluster target has been finished and the results of the test running are presented.
会议录HCI 2006: 13TH INTERNATIONAL CONFERENCE ON THE PHYSICS OF HIGHLY CHARGED IONS
会议录出版者IOP PUBLISHING LTD
会议录出版地DIRAC HOUSE, TEMPLE BACK, BRISTOL BS1 6BE, ENGLAND
语种英语
WOS研究方向Astronomy & Astrophysics ; Physics
WOS记录号WOS:000246424800008
内容类型会议论文
源URL[http://119.78.100.186/handle/113462/57837]  
专题近代物理研究所_实验物理中心
近代物理研究所_兰州重离子研究装置
通讯作者Cai, Xiaohong
作者单位1.Chinese Acad Sci, Inst Modern Phys, Lanzhou 730000, Peoples R China
2.Budker Inst Nucl Phys, Novosibirsk 630090, Russia
推荐引用方式
GB/T 7714
Scott, MP,Cai, Xiaohong,Lu, Rongchun,et al. The progress of the HIRFL-CSR project and the commissioning of the cluster target[C]. 见:.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace