Operation status of secral at IMP | |
Lu, W.1,2; Zhang, X.Z.1; Zhao, H.W.1; Feng, Y.C.1; Guo, J.W.1; Cao, Y.1; Li, J.Y.1; Li, X.X.1; Guo, X.H.1; Zhao, H.Y.1 | |
2011 | |
会议地点 | Kursaal, San Sebastian, Spain |
页码 | 1750-1752 |
英文摘要 | SECRAL (Superconducting ECR ion source with Advanced design in Lanzhou) is an advanced superconducting ECR ion source built with an innovative solenoid-inside-sextupole structure in 2005. Since 2007, SECRAL has delivered a good variety of highly-charged ion beams to HIRFL (Heavy Ion Research Facility in Lanzhou), such as 129Xe27+,78Kr 19+,209Bi36+ and 58,64Ni 19+ etc., and its beam delivery time increased greatly year by year. So far up to July 2011, the beam delivery by SECRAL has totalled up to almost 8000 hours. To meet the increasing demands, further improvements are planned and undertaking to enhance the capability of SECRAL. Detail results and discussions are presented in this paper.. Copyright © 2011 by IPAC'11/EPS-AG. |
会议录 | 2nd International Particle Accelerator Conference, IPAC 2011 |
会议录出版者 | International Particle Accelerator Conference'11, Spain |
内容类型 | 会议论文 |
源URL | [http://119.78.100.186/handle/113462/63903] |
专题 | 中国科学院近代物理研究所 |
作者单位 | 1.Chinese Academy of Sciences, Institute of Modern Physics (IMP), Lanzhou 730000, China 2.School of Chinese Academy of Sciences, Beijing 100049, China |
推荐引用方式 GB/T 7714 | Lu, W.,Zhang, X.Z.,Zhao, H.W.,et al. Operation status of secral at IMP[C]. 见:. Kursaal, San Sebastian, Spain. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论