Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility | |
Zhong, Weiya1; Shi, Yun2 | |
刊名 | JOURNAL OF COMBINATORIAL OPTIMIZATION
![]() |
2018-01 | |
卷号 | 35期号:1页码:108-125 |
关键词 | Scheduling No-wait Hybrid flowshop Inter-stage flexibility Approximation algorithm |
ISSN号 | 1382-6905 |
DOI | 10.1007/s10878-017-0155-8 |
英文摘要 | This paper addresses the performance of scheduling algorithms for a two-stage no-wait hybrid flowshop environment with inter-stage flexibility, where there exist several parallel machines at each stage. Each job, composed of two operations, must be processed from start to completion without any interruption either on or between the two stages. For each job, the total processing time of its two operations is fixed, and the stage-1 operation is divided into two sub-parts: an obligatory part and an optional part (which is to be determined by a solution), with a constraint that no optional part of a job can be processed in parallel with an idleness of any stage-2 machine. The objective is to minimize the makespan. We prove that even for the special case with only one machine at each stage, this problem is strongly NP-hard. For the case with one machine at stage 1 and m machines at stage 2, we propose two polynomial time approximation algorithms with worst case ratio of and , respectively. For the case with m machines at stage 1 and one machine at stage 2, we propose a polynomial time approximation algorithm with worst case ratio of 2. We also prove that all the worst case ratios are tight. |
WOS研究方向 | Computer Science ; Mathematics |
语种 | 英语 |
出版者 | SPRINGER |
WOS记录号 | WOS:000419682800009 |
内容类型 | 期刊论文 |
源URL | [http://10.2.47.112/handle/2XS4QKH4/804] ![]() |
专题 | 上海财经大学 |
通讯作者 | Zhong, Weiya |
作者单位 | 1.Shanghai Univ, Sch Management, Dept Business Adm, Shanghai 200444, Peoples R China; 2.Shanghai Univ Finance & Econ, Sch Informat Management & Engn, Shanghai 200433, Peoples R China |
推荐引用方式 GB/T 7714 | Zhong, Weiya,Shi, Yun. Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility[J]. JOURNAL OF COMBINATORIAL OPTIMIZATION,2018,35(1):108-125. |
APA | Zhong, Weiya,&Shi, Yun.(2018).Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility.JOURNAL OF COMBINATORIAL OPTIMIZATION,35(1),108-125. |
MLA | Zhong, Weiya,et al."Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility".JOURNAL OF COMBINATORIAL OPTIMIZATION 35.1(2018):108-125. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论