CORC  > 北京大学  > 工学院
Mathematical models for capacitated multi-level production planning problems with linked lot sizes
Wu, Tao ; Shi, Leyuan
刊名international journal of production research
2011
关键词lot sizing production planning optimisation OR SETUP CARRY-OVER SIZING PROBLEM LOTSIZING PROBLEM UP CARRYOVER FORMULATION TIMES FRAMEWORK
DOI10.1080/00207543.2010.535043
英文摘要Various mixed-integer programming models have been proposed for solving the capacitated multi-level lot sizing problem with linked lot sizes. It would be of value for researchers and practitioners to know which of these models is the most efficient under different circumstances. To investigate the comparative efficiencies associated with these models, this paper therefore demonstrates theoretically the relationships between these models when the integrality requirement is relaxed for any subset of binary setup and setup-carryover variables, shows the relative effectiveness of these models in obtaining lower bound solutions associated with linear programming relaxations, and evaluates the relative computational resources and the time needed when using these models through intensive computational tests. These theoretical and numerical results are expected to provide significant guidelines for choosing an effective formulation for different situations.; http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000299896000013&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=8e1609b174ce4e31116a60747a720701 ; Engineering, Industrial; Engineering, Manufacturing; Operations Research & Management Science; SCI(E); EI; 15; ARTICLE; 20; 6227-6247; 49
语种英语
内容类型期刊论文
源URL[http://ir.pku.edu.cn/handle/20.500.11897/243631]  
专题工学院
推荐引用方式
GB/T 7714
Wu, Tao,Shi, Leyuan. Mathematical models for capacitated multi-level production planning problems with linked lot sizes[J]. international journal of production research,2011.
APA Wu, Tao,&Shi, Leyuan.(2011).Mathematical models for capacitated multi-level production planning problems with linked lot sizes.international journal of production research.
MLA Wu, Tao,et al."Mathematical models for capacitated multi-level production planning problems with linked lot sizes".international journal of production research (2011).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace