Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach | |
Cheng, G. H. ; Huang, G. H. ; Li, Y. P. ; Cao, M. F. ; Fan, Y. R. | |
刊名 | stochastic environmental research and risk assessment
![]() |
2009 | |
关键词 | Chance-constrained programming Inexact optimization Dual uncertainty Random boundary interval Solid waste management FUZZY MODEL |
DOI | 10.1007/s00477-008-0251-5 |
英文摘要 | In this study, a random-boundary-interval linear programming (RBILP) method is developed and applied to the planning of municipal solid waste (MSW) management under dual uncertainties. In the RBILP model, uncertain inputs presented as interval numbers can be directly communicated into the optimization process; besides, intervals with uncertain lower and upper bounds can be handled through introducing the concept of random boundary interval. Consequently, robustness of the optimization process can be enhanced. To handle uncertainties with such complex presentations, an integrated chance-constrained programming and interval-parameter linear programming approach (ICCP) is proposed. ICCP can help analyze the reliability of satisfying (or risk of violating) system constraints under uncertainty. The applicability of the proposed RBILP and ICCP approach is validated through a case study of MSW management. Violations for capacity constraints are allowed under a range of significant levels. Interval solutions associated with different risk levels of constraint violation are obtained. They can be used for generating decision alternatives and thus helping waste managers to identify desired policies under various environmental, economic, and system-reliability constraints.; http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000267298600002&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=8e1609b174ce4e31116a60747a720701 ; Engineering, Environmental; Engineering, Civil; Environmental Sciences; Statistics & Probability; Water Resources; SCI(E); EI; 25; ARTICLE; 6; 707-720; 23 |
语种 | 英语 |
内容类型 | 期刊论文 |
源URL | [http://ir.pku.edu.cn/handle/20.500.11897/246783] ![]() |
专题 | 城市与环境学院 |
推荐引用方式 GB/T 7714 | Cheng, G. H.,Huang, G. H.,Li, Y. P.,et al. Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach[J]. stochastic environmental research and risk assessment,2009. |
APA | Cheng, G. H.,Huang, G. H.,Li, Y. P.,Cao, M. F.,&Fan, Y. R..(2009).Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach.stochastic environmental research and risk assessment. |
MLA | Cheng, G. H.,et al."Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach".stochastic environmental research and risk assessment (2009). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论