CORC  > 寒区旱区环境与工程研究所
Study of the function of the insulation layer for treating water leakage in permafrost tunnels
Zhang Xuefu; Xiao Jianzhang; Zhang Yaonan; Xiao Shengxie
刊名APPLIED THERMAL ENGINEERING
2007-02-01
卷号27期号:2-3页码:637-645
关键词the cold region tunnels seepage field the coupled problem the insulation layer three-dimensional nonlinear analysis
ISSN号1359-4311
DOI10.1016/j.applthermaleng.2006.05.032
通讯作者Zhang Xuefu(zhangxuefu400074@126.com)
英文摘要Qinghai-Tibet Railway is one of the national momentous construction projects in the West Development Plan of China. Kunlun mountain tunnel is the key control engineering of the railway. But, according to the observation in-situ data, on May 22, 2003, water irruption took place in the construction joints at DK977 + 620 section (the sign DK is an abbreviation of distance kilometer, the number 977 expresses the 977 km, and the number 620 expresses 620 m), and the maximum flux of the water reached to about 200 m(3)/d(1 m(3)/d means one cubic meter per day), and the water pressure increased violently. In this paper, the status of water leakage of Kunlun mountain tunnel on Qinghai-Tibet railway is introduced by the time step. Based on the status of water leakage, the reason for water leakage in the tunnel is opened out. According to the basal theories of heat transfer and seepage, considering the coupled effect of seepage field and temperature field, a three-dimensional calculational model of the coupled problem are given, and the finite element formulae are obtained by Galerkin's method, and the computer program is written. Using this model and program, three-dimensional nonlinear analysis for the coupled problem of the flat buried part from DK977 + 578 to DK977 + 682 in Kunlun mountain tunnel on Qinghai-Tibet Railway are made either with or without the insulation layer. The result shows that it is necessary for treating water leakage to fit the insulation layer between the two linings in Kunlun mountain tunnel. (c) 2006 Elsevier Ltd. All rights reserved.
收录类别SCI
WOS关键词COLD REGIONS TUNNELS ; NONLINEAR-ANALYSIS ; COUPLED PROBLEM ; SEEPAGE ; TEMPERATURE ; FIELDS
WOS研究方向Thermodynamics ; Energy & Fuels ; Engineering ; Mechanics
WOS类目Thermodynamics ; Energy & Fuels ; Engineering, Mechanical ; Mechanics
语种英语
出版者PERGAMON-ELSEVIER SCIENCE LTD
WOS记录号WOS:000241706500041
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2555958
专题寒区旱区环境与工程研究所
通讯作者Zhang Xuefu
作者单位1.Chongqing Jiaotong Univ, Sch Civil Engn & Architecture, Chongqing 400074, Peoples R China
2.Chinese Acad Sci, State Key Lab Frozen Soil Engn, Cold & Arid Reg Environm & Engn Res Inst, Lanzhou 730000, Peoples R China
3.Minist Commun, Res Inst Highway, Beijing 100088, Peoples R China
4.Beijing Water Conservancy Sch, Beijing 100024, Peoples R China
推荐引用方式
GB/T 7714
Zhang Xuefu,Xiao Jianzhang,Zhang Yaonan,et al. Study of the function of the insulation layer for treating water leakage in permafrost tunnels[J]. APPLIED THERMAL ENGINEERING,2007,27(2-3):637-645.
APA Zhang Xuefu,Xiao Jianzhang,Zhang Yaonan,&Xiao Shengxie.(2007).Study of the function of the insulation layer for treating water leakage in permafrost tunnels.APPLIED THERMAL ENGINEERING,27(2-3),637-645.
MLA Zhang Xuefu,et al."Study of the function of the insulation layer for treating water leakage in permafrost tunnels".APPLIED THERMAL ENGINEERING 27.2-3(2007):637-645.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace