Base on Honeywell Business FLEX (R) PKS (TM) Planning and Scheduling Optimization Engineering Study | |
Huang Zhihui[1]; Kan Shulin[2]; Yan Liangwen[3]; Li Jun[4] | |
2011 | |
会议名称 | MATERIALS, MECHATRONICS AND AUTOMATION, PTS 1-3 |
会议日期 | 2011-01-15 |
关键词 | Relibaility engineering Manufacturing Execution Systems (MES) Optimization |
页码 | 862-865 |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2307570 |
专题 | 上海大学 |
作者单位 | 1.[1]Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China. 2.[2]Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China. 3.[3]Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China. 4.[4]Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China. |
推荐引用方式 GB/T 7714 | Huang Zhihui[1],Kan Shulin[2],Yan Liangwen[3],et al. Base on Honeywell Business FLEX (R) PKS (TM) Planning and Scheduling Optimization Engineering Study[C]. 见:MATERIALS, MECHATRONICS AND AUTOMATION, PTS 1-3. 2011-01-15. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论