CORC  > 上海大学
An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
Zhong, Weiya[1]
刊名OPTIMIZATION LETTERS
2015
卷号9页码:537-567
关键词Scheduling Approximate algorithm
ISSN号1862-4472
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2236980
专题上海大学
作者单位[1] Shanghai Univ, Sch Management, Dept Business Adm, Shanghai, Peoples R China.
推荐引用方式
GB/T 7714
Zhong, Weiya[1]. An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates[J]. OPTIMIZATION LETTERS,2015,9:537-567.
APA Zhong, Weiya[1].(2015).An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates.OPTIMIZATION LETTERS,9,537-567.
MLA Zhong, Weiya[1]."An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates".OPTIMIZATION LETTERS 9(2015):537-567.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace