A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops | |
Weiwei Cui[1]; Zhiqiang Lu[2]; Chen Li[3]; Xiaole Han[4] | |
刊名 | Computers & Industrial Engineering |
2018 | |
卷号 | 115页码:342-353 |
关键词 | Flow-shop Scheduling Maintenance Proactive |
ISSN号 | 0360-8352 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2181930 |
专题 | 上海大学 |
作者单位 | [1]School of Management, Shanghai University, Shanghai 200444, PR China[2]School of Mechanical Engineering, Tongji University, Shanghai 201804, PR China[3]School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai 200240, PR China[4]School of Mechanical Engineering, Tongji University, Shanghai 201804, PR China |
推荐引用方式 GB/T 7714 | Weiwei Cui[1],Zhiqiang Lu[2],Chen Li[3],et al. A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops[J]. Computers & Industrial Engineering,2018,115:342-353. |
APA | Weiwei Cui[1],Zhiqiang Lu[2],Chen Li[3],&Xiaole Han[4].(2018).A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops.Computers & Industrial Engineering,115,342-353. |
MLA | Weiwei Cui[1],et al."A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops".Computers & Industrial Engineering 115(2018):342-353. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论