CORC  > 华南理工大学
A study of the preheating temperature of directly buried heat-supply pipeline based on intermediate stress (EI收录)
Wang, Fei[1]; Wang, Guowei[1]; Zou, Pinghua[2]
会议名称Proceedings - 6th International Symposium on Heating, Ventilating and Air Conditioning, ISHVAC 2009
会议日期November 6, 2009 - November 9, 2009
会议地点Nanjing, China
关键词Air conditioning Energy utilization Heating Pipe Pipelines
URL标识查看原文
内容类型会议论文
URI标识http://www.corc.org.cn/handle/1471x/2077857
专题华南理工大学
作者单位1.[1] College of Environmental Science and Engineering, Taiyuan University of Technology, Taiyuan, China
2.[2] Urban Institute, Harbin Institute of Technology, China
推荐引用方式
GB/T 7714
Wang, Fei[1],Wang, Guowei[1],Zou, Pinghua[2]. A study of the preheating temperature of directly buried heat-supply pipeline based on intermediate stress (EI收录)[C]. 见:Proceedings - 6th International Symposium on Heating, Ventilating and Air Conditioning, ISHVAC 2009. Nanjing, China. November 6, 2009 - November 9, 2009.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace