Optimal sitting and sizing of distributed generators based on a modified primal-dual interior point algorithm (EI收录) | |
Liu, Zhipeng[1]; Wen, Fushuan[2]; Ledwich, Gerard[2]; Ji, Xingquan[3] | |
会议名称 | DRPT 2011 - 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies |
会议日期 | July 6, 2011 - July 9, 2011 |
会议地点 | Weihai, Shandong, China |
关键词 | Algorithms Deregulation Distributed power generation Electric equipment protection Electric utilities Energy dissipation Energy utilization Investments Optimization Power transmission |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2058373 |
专题 | 华南理工大学 |
作者单位 | 1.[1] School of Electrical Engineering, South China University of Technology, Guangzhou 510640, Guangdong, China 2.[2] School of Engineering Systems, Queensland University of Technology, Brisbane, QLD 4001, Australia 3.[3] College of Information and Electrical Engineering, Shandong University of Science and Technology, Qingdao 266510, Shandong, China |
推荐引用方式 GB/T 7714 | Liu, Zhipeng[1],Wen, Fushuan[2],Ledwich, Gerard[2],等. Optimal sitting and sizing of distributed generators based on a modified primal-dual interior point algorithm (EI收录)[C]. 见:DRPT 2011 - 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Weihai, Shandong, China. July 6, 2011 - July 9, 2011. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论