Study on the mid-long term optimal operation model and its algorithm for cascade hydropower stations on the lower-reach of Yalong River | |
Huang, Weibin; Ma, Guangwen; Wang, Hekang; Tang, Ming; Wang, Liming | |
刊名 | Shuili Fadian Xuebao/Journal of Hydroelectric Engineering
![]() |
2009 | |
卷号 | Vol.28 No.1页码:1-4 |
ISSN号 | 1003-1243 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/1996870 |
专题 | 四川大学 |
作者单位 | School of Hydroelectric Engineering, Sichuan University, Chengdu 610065, China |
推荐引用方式 GB/T 7714 | Huang, Weibin,Ma, Guangwen,Wang, Hekang,et al. Study on the mid-long term optimal operation model and its algorithm for cascade hydropower stations on the lower-reach of Yalong River[J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering,2009,Vol.28 No.1:1-4. |
APA | Huang, Weibin,Ma, Guangwen,Wang, Hekang,Tang, Ming,&Wang, Liming.(2009).Study on the mid-long term optimal operation model and its algorithm for cascade hydropower stations on the lower-reach of Yalong River.Shuili Fadian Xuebao/Journal of Hydroelectric Engineering,Vol.28 No.1,1-4. |
MLA | Huang, Weibin,et al."Study on the mid-long term optimal operation model and its algorithm for cascade hydropower stations on the lower-reach of Yalong River".Shuili Fadian Xuebao/Journal of Hydroelectric Engineering Vol.28 No.1(2009):1-4. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论