CORC  > 四川大学
Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective
Song, X.; Xu, J.; Shen, C.; Peña-Mora, F.
刊名Automation in Construction
2018
卷号Vol.87页码:138-157
关键词Bi-level model Bi-PSO Bi-stakeholder decision conflict Material logistics plan Site layout
ISSN号0926-5805
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/1822059
专题四川大学
作者单位1.State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu, China
2.Advanced ConsTruction and InfOrmation techNology Laboratory, Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, United States
3.a Department of Management Science and Engineering, School of Economics and Management, Nanjing University of Science and Technology, Nanjing, China
推荐引用方式
GB/T 7714
Song, X.,Xu, J.,Shen, C.,et al. Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective[J]. Automation in Construction,2018,Vol.87:138-157.
APA Song, X.,Xu, J.,Shen, C.,&Peña-Mora, F..(2018).Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective.Automation in Construction,Vol.87,138-157.
MLA Song, X.,et al."Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective".Automation in Construction Vol.87(2018):138-157.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace