Correlation between time-delayed rockburst and blasting disturbance in deep-buried tunnel | |
Zhao, Z. N.1; Feng, X. T.1; Chen, T. Y.1; Feng, G. L.2; Liu, G. F.2; Duan, S. Q.2 | |
2013 | |
会议日期 | JUN 18-20, 2013 |
会议地点 | Tongji Univ, Shanghai, PEOPLES R CHINA |
页码 | 773-776 |
英文摘要 | The deep-buried tunnels in Jinping II Hydropower Station are characterized by great depth, long length, large size in diameter and high geo-stress. During the excavation, by drilling and blasting method, of these tunnels, lots of the time-delayed rockbursts occurred; and blasting disturbance was one of triggering factors of their occurrence. This paper discusses the correlation between time-delayed rockbursts and blasting disturbance profoundly from two aspects of blasting disturbance strength and the delayed time of the time-delayed rockbursts. And the main conclusions were presented as follows: (1) the number of time-delayed rockbursts does not reduce with the increase of their distance from explosive center; (2) the risk of the time-delayed rockburst in situations with several working faces is obviously higher than that with single tunnel face; (3) most of the time-delayed rockbursts occur within seven days to one month after excavation; (4) the relationship between frequency of the time-delayed rockbursts and their delayed blasting time is a good power function, and the peak period of rockburst activities is within 4 hours after blasting. |
源文献作者 | Feng, XT ; Hudson, JA ; Tan, F |
会议录 | ROCK CHARACTERISATION, MODELLING AND ENGINEERING DESIGN METHODS
![]() |
会议录出版者 | CRC PRESS-TAYLOR & FRANCIS GROUP |
会议录出版地 | BOCA RATON |
语种 | 英语 |
WOS研究方向 | Engineering |
WOS记录号 | WOS:000342685900133 |
内容类型 | 会议论文 |
源URL | [http://119.78.100.198/handle/2S6PX9GI/4768] ![]() |
专题 | 岩土力学所知识全产出_会议论文 国家重点实验室知识产出_会议论文 |
作者单位 | 1.Northeastern Univ, Minist Educ Safe Min Deep Met Mines, Key Lab; 2.Chinese Acad Sci, State Key Lab Geomech & Geotech Engn, Inst Rock & Soil Mech |