Principle of in-situ 3D rock stress measurement with borehole wall stress relief method and its preliminary applications to determination of in-situ rock stress orientation and magnitude in Jinping hydropower station
Hou MingXun2; Ge XiuRun1,2,3
刊名SCIENCE CHINA-TECHNOLOGICAL SCIENCES
2012
卷号55期号:4页码:939-949
关键词rock mechanics and engineering in-situ rock stress measurement stress relief method Jinping hydropower engineering
ISSN号1674-7321
DOI10.1007/s11431-011-4680-x
英文摘要As a main constituent of geological body, the rock masses have distinct differences from other materials, one of which is that rock masses are initially stressed in their natural states. Hence, it is an extremely challenging and significant research project to know the present residual stress of the rock masses in the earth's crust. Although some regularities of distribution of in-situ rock stresses can be deduced, the basic means to study the state of rock stress is in-situ stress measurement. After a brief review of several measuring methods of in-situ 3D rock stress, a new one, borehole wall stress relief method (BWSRM) to determine the in-situ 3D rock stress tensor in a single drilled borehole was proposed. Based on the principle of in-situ rock stress measurement with BWSRM, an original geostress measuring instrument was designed and manufactured. Preliminary experiments for determination of in-situ stress orientation and magnitude were carried out at an experimental tunnel in Jinping II hydropower station in China, where the buried depth of overburden was about 2430 m. The results showed that it was feasible to measure the in-situ 3D rock stresses with BWSRM presented in this paper. The BWSRM has a broad prospect for in-situ 3D rock stress measurements in practical rock engineering.
WOS研究方向Engineering ; Materials Science
语种英语
出版者SCIENCE PRESS
WOS记录号WOS:000301595600011
内容类型期刊论文
源URL[http://119.78.100.198/handle/2S6PX9GI/3338]  
专题岩土力学所知识全产出_期刊论文
国家重点实验室知识产出_期刊论文
作者单位1.Chinese Acad Sci, Inst Rock & Soil Mech ;
2.Shanghai Jiao Tong Univ, Inst Geotech Engn ;
3.State Key Lab Geomech & Geotech Engn
推荐引用方式
GB/T 7714
Hou MingXun,Ge XiuRun. Principle of in-situ 3D rock stress measurement with borehole wall stress relief method and its preliminary applications to determination of in-situ rock stress orientation and magnitude in Jinping hydropower station[J]. SCIENCE CHINA-TECHNOLOGICAL SCIENCES,2012,55(4):939-949.
APA Hou MingXun,&Ge XiuRun.(2012).Principle of in-situ 3D rock stress measurement with borehole wall stress relief method and its preliminary applications to determination of in-situ rock stress orientation and magnitude in Jinping hydropower station.SCIENCE CHINA-TECHNOLOGICAL SCIENCES,55(4),939-949.
MLA Hou MingXun,et al."Principle of in-situ 3D rock stress measurement with borehole wall stress relief method and its preliminary applications to determination of in-situ rock stress orientation and magnitude in Jinping hydropower station".SCIENCE CHINA-TECHNOLOGICAL SCIENCES 55.4(2012):939-949.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace