Study on the status of subgrade engineering in permafrost region during the early operation of the Qinghai-Tibet railway | |
Shi, Gangqiang; Li, Yongqiang; Shi, G. | |
2011 | |
会议日期 | July 26, 2011 - July 28, 2011 |
会议地点 | Hangzhou, China |
关键词 | Railroad transportation Permafrost Railroads Hydrothermal conditions Operating condition Operation Permafrost region Qinghai Tibet railway Railway safety Subgrade engineering |
DOI | 10.1109/ICMT.2011.6002912 |
页码 | 4137-4139 |
英文摘要 | The Golmud-Lhasa section of the Qinghai-Tibet railway (QTR) is 1,142 Km long, of which 550 Km is in permafrost region. Studies on the status of subgrade engineering in permafrost region are complicated by the intervention of temperature and water and railway operating conditions. Based on in-site investigation and monitoring during the early operation of the QTR, we studied the status of subgrade engineering from three aspects, subgrade deformation, geothermal changes and hydrothermal conditions, and proposed solutions to subgrade cracks to ensure railway safety and conservation. © 2011 IEEE. |
会议录 | 2011 International Conference on Multimedia Technology, ICMT 2011
![]() |
会议录出版地 | Piscataway |
语种 | 英语 |
内容类型 | 会议论文 |
源URL | [http://ir.lzu.edu.cn/handle/262010/184148] ![]() |
专题 | 土木工程与力学学院_会议论文 |
通讯作者 | Shi, G. |
推荐引用方式 GB/T 7714 | Shi, Gangqiang,Li, Yongqiang,Shi, G.. Study on the status of subgrade engineering in permafrost region during the early operation of the Qinghai-Tibet railway[C]. 见:. Hangzhou, China. July 26, 2011 - July 28, 2011. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论