早时标网络计划的快速绘制法 | |
苏泽斌 | |
刊名 | http://epub.edu.cnki.net/grid2008/brief/detailj.aspx?filename=jzsx200830145&dbcode=CJFQ&dbname=CJFQ2008 |
2012-06-05 ; 2012-06-05 | |
关键词 | 早时标网络计划 施工组织设计 最早时间 early time scale network planning construction organization design the earliest date TU721.3 |
其他题名 | Fast drawing method of the early time scale network planning |
中文摘要 | 阐述了早时标网络计划的编制特点,结合多年的教学和实践,总结出早时标网络计划的绘制方法和步骤,通过实例证明,早时标网络计划具有图形表达直观、逻辑关系明确等优点。; The author describes the compilation characteristics of the early time scale network planning,summarizes the drawing method and the steps of the early time scale network planning combined with the teaching and practice for many years,the practice shows that the early time scale network planning has the advantages such as the figure intuition and the clear logical relation and so on.; 【作者单位】集美大学工程技术学院;【作者英文名】SU Ze-bin |
语种 | 中文 |
内容类型 | 期刊论文 |
源URL | [http://ir.calis.edu.cn/hdl/235041/13544] |
专题 | 集美大学 |
推荐引用方式 GB/T 7714 | 苏泽斌. 早时标网络计划的快速绘制法[J]. http://epub.edu.cnki.net/grid2008/brief/detailj.aspx?filename=jzsx200830145&dbcode=CJFQ&dbname=CJFQ2008,2012, 2012. |
APA | 苏泽斌.(2012).早时标网络计划的快速绘制法.http://epub.edu.cnki.net/grid2008/brief/detailj.aspx?filename=jzsx200830145&dbcode=CJFQ&dbname=CJFQ2008. |
MLA | 苏泽斌."早时标网络计划的快速绘制法".http://epub.edu.cnki.net/grid2008/brief/detailj.aspx?filename=jzsx200830145&dbcode=CJFQ&dbname=CJFQ2008 (2012). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论