Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
Lu, Ming ; Zhang, Yang ; Zhang, Jianping ; Hu, Zhenzhong ; Li, Jiulin
2010-10-12 ; 2010-10-12
关键词visualization 3D modeling computer aided design animation simulation construction management project management DISCRETE-EVENT SIMULATION SITE LAYOUT CAD Engineering, Civil
中文摘要In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the "Bird's Nest''). We propose a "zoom'' interface between 4D CAD and 3D animation of operations simulation to enable a natural synergy of two separate, but organically linked research streams. For concept proving and application demonstration, we seamlessly integrated two computer systems resulting from previous in-house research to plan and visualize the construction of the "Bird's Nest'' in close collaboration with the main contractor. The integrated construction planning methodology is found instrumental in visually and intuitively conveying the master project schedule and detailed operations plan for construction of the " Bird's Nest''.
语种英语 ; 英语
出版者NATL RESEARCH COUNCIL CANADA-N R C RESEARCH PRESS ; OTTAWA ; BUILDING M 55, OTTAWA, ON K1A 0R6, CANADA
内容类型期刊论文
源URL[http://hdl.handle.net/123456789/82073]  
专题清华大学
推荐引用方式
GB/T 7714
Lu, Ming,Zhang, Yang,Zhang, Jianping,et al. Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games[J],2010, 2010.
APA Lu, Ming,Zhang, Yang,Zhang, Jianping,Hu, Zhenzhong,&Li, Jiulin.(2010).Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games..
MLA Lu, Ming,et al."Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games".(2010).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace