Closure to "safety risk identification and assessment for Beijing olympic venues construction" | |
Yu Sun ; Dongping Fang ; Shouqing Wang ; Mengdong Dai ; Xiaoquan Lv | |
2010-10-12 ; 2010-10-12 | |
关键词 | General or Review/ decision making international collaboration occupational safety project management risk management sport structural engineering/ Beijing olympic venues construction project management environment-friendly construction risk management AHP risk assessment model risk occurrence risk factor structural safety construction workers international collaborations/ E3030 Construction industry E0110 Organisational aspects E0260 Social and political issues E0120 Management issues E0240H Health and safety aspects E1010 Production management E2110 Mechanical structures E3050 Service industries |
中文摘要 | The objectives of the Beijing Olympic venue construction are clearly defined as three sub objectives: well-performed venue and facility, successful project management, and safe and environment-friendly construction, respectively. The AHP model set up in the original paper is a risk assessment model rather than a checklist for risk management. So the AHP risk assessment model is based on the critical risk factors through risk identification and prioritization rather than including all the related factors. The framework of the model focuses on the root causes in the risk occurrence chain with the consideration of the feasibility that the risk factor was able to be assessed by the managerial personnel (Fang et al. 2005; Zhu et al. 2007). The paper presents the explanations and discussions regarding natural conditions, structural safety, construction workers, and international collaborations presented by the discussers. |
语种 | 英语 |
出版者 | American Society of Civil Engineers ; USA |
内容类型 | 期刊论文 |
源URL | [http://hdl.handle.net/123456789/81924] |
专题 | 清华大学 |
推荐引用方式 GB/T 7714 | Yu Sun,Dongping Fang,Shouqing Wang,et al. Closure to "safety risk identification and assessment for Beijing olympic venues construction"[J],2010, 2010. |
APA | Yu Sun,Dongping Fang,Shouqing Wang,Mengdong Dai,&Xiaoquan Lv.(2010).Closure to "safety risk identification and assessment for Beijing olympic venues construction".. |
MLA | Yu Sun,et al."Closure to "safety risk identification and assessment for Beijing olympic venues construction"".(2010). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论