CORC  > 清华大学
Fuzzy project scheduling problem and its hybrid intelligent algorithm
Ke, Hua ; Liu, Baoding
2010-10-12 ; 2010-10-12
关键词Project scheduling Fuzzy programming Fuzzy simulation Genetic algorithm PERT ASSUMPTIONS COSTS TIME NETWORKS MODELS Engineering, Multidisciplinary Mathematics, Interdisciplinary Applications Mechanics
中文摘要Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time. This paper considers a type of project scheduling problem with fuzzy activity duration times. According to some management goals, three types of fuzzy models are built to solve the project scheduling problem. Moreover, the technique of fuzzy simulation and genetic algorithm are integrated to design a hybrid intelligent algorithm to solve the fuzzy models. Finally, some numerical examples are given to illustrate the effectiveness of the algorithm. (c) 2009 Elsevier Inc. All rights reserved.
语种英语 ; 英语
出版者ELSEVIER SCIENCE INC ; NEW YORK ; 360 PARK AVE SOUTH, NEW YORK, NY 10010-1710 USA
内容类型期刊论文
源URL[http://hdl.handle.net/123456789/81239]  
专题清华大学
推荐引用方式
GB/T 7714
Ke, Hua,Liu, Baoding. Fuzzy project scheduling problem and its hybrid intelligent algorithm[J],2010, 2010.
APA Ke, Hua,&Liu, Baoding.(2010).Fuzzy project scheduling problem and its hybrid intelligent algorithm..
MLA Ke, Hua,et al."Fuzzy project scheduling problem and its hybrid intelligent algorithm".(2010).