Quay crane scheduling with handling priority in port container terminals | |
Lee, Der-Horng ; Wang, Hui Qiu ; Miao, Lixin | |
2010-05-11 ; 2010-05-11 | |
关键词 | port container terminal quay crane scheduling handling priority genetic algorithm SCHEMES BRANCH Engineering, Multidisciplinary Operations Research & Management Science |
中文摘要 | The quay crane scheduling problem studied in this article is to determine a handling sequence of ship bays for quay cranes assigned to a container ship considering handling priority of every ship bay. This article provides a mixed integer programming model for the considered problem. A genetic algorithm (GA) is proposed to obtain near-optimal solutions. Computational experiments to examine the proposed model and solution algorithm are described. The computational results show that the proposed GA is effective and efficient in solving the considered quay crane scheduling problem. |
语种 | 英语 ; 英语 |
出版者 | TAYLOR & FRANCIS LTD ; ABINGDON ; 4 PARK SQUARE, MILTON PARK, ABINGDON OX14 4RN, OXON, ENGLAND |
内容类型 | 期刊论文 |
源URL | [http://hdl.handle.net/123456789/26391] ![]() |
专题 | 清华大学 |
推荐引用方式 GB/T 7714 | Lee, Der-Horng,Wang, Hui Qiu,Miao, Lixin. Quay crane scheduling with handling priority in port container terminals[J],2010, 2010. |
APA | Lee, Der-Horng,Wang, Hui Qiu,&Miao, Lixin.(2010).Quay crane scheduling with handling priority in port container terminals.. |
MLA | Lee, Der-Horng,et al."Quay crane scheduling with handling priority in port container terminals".(2010). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论