CORC  > 清华大学
Research on priority scheduling algorithm based on bottleneck analysis
Li Li ; Cheng Ye ; Yuan Shou-hua
2010-05-10 ; 2010-05-10
关键词Practical Theoretical or Mathematical/ dynamic scheduling manufacturing systems optimised production technology/ priority scheduling algorithm manufacturing execution system real-time production scheduling dynamic production scheduling optimized production technology shifting bottleneck heuristic/ C1290F Systems theory applications in industry C1180 Optimisation techniques E1010 Production management E1510 Manufacturing systems E0210G Optimisation E1540 Systems theory applications
中文摘要The wide application of MES (manufacturing execution system) in manufacturing system makes it possible for dynamic and real-time production scheduling to be implemented. At the same time, the scheduling algorithm designed for MES is required to meet its dynamic and real-time performance. A compromise must be balanced between the quality of solutions and the time consumed by computation. Aiming to solve the scheduling problem in MES, a priority scheduling algorithm, based on bottleneck analysis, was proposed. This algorithm is derived from the idea of optimized production technology and shifting bottleneck heuristic (SBH).
语种英语 ; 英语
出版者Editorial Department of CIMS ; China
内容类型期刊论文
源URL[http://hdl.handle.net/123456789/23665]  
专题清华大学
推荐引用方式
GB/T 7714
Li Li,Cheng Ye,Yuan Shou-hua. Research on priority scheduling algorithm based on bottleneck analysis[J],2010, 2010.
APA Li Li,Cheng Ye,&Yuan Shou-hua.(2010).Research on priority scheduling algorithm based on bottleneck analysis..
MLA Li Li,et al."Research on priority scheduling algorithm based on bottleneck analysis".(2010).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace