Project scheduling problem with stochastic activity duration times
Ke, H ; Liu, BD
2010-05-06 ; 2010-05-06
关键词project scheduling stochastic programming stochastic simulation genetic algorithm PERT ASSUMPTIONS COSTS OPTIMIZATION NETWORKS Mathematics, Applied
中文摘要Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time. This paper considers project scheduling problem with stochastic activity duration times, which has the objective of minimizing the total cost under some completion time limits. Three types of stochastic models will be built to solve the problem according to different management requirements. Moreover, stochastic simulation and genetic algorithm will be integrated to design a hybrid intelligent algorithm to solve the above models. Finally, some numerical examples are illustrated to show the effectiveness of the algorithm. (c) 2004 Elsevier Inc. All rights reserved.
语种英语 ; 英语
出版者ELSEVIER SCIENCE INC ; NEW YORK ; 360 PARK AVE SOUTH, NEW YORK, NY 10010-1710 USA
内容类型期刊论文
源URL[http://hdl.handle.net/123456789/13912]  
专题清华大学
推荐引用方式
GB/T 7714
Ke, H,Liu, BD. Project scheduling problem with stochastic activity duration times[J],2010, 2010.
APA Ke, H,&Liu, BD.(2010).Project scheduling problem with stochastic activity duration times..
MLA Ke, H,et al."Project scheduling problem with stochastic activity duration times".(2010).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace